PORTFOLIO
IBERDROLA
VIEW PROJECT
CONTRACTS & CLAIM MANAGER FOR AMS (IBERDROLA) and for VULCAIN ENGINEERING:
◆ 496MW / 62 turbines
◆ Public Contract
◆ Project value: 2 billion euros
◆ The Company: AMS
◆ Main Contractor: VAN OORD
◆ Magement of Construction: Vulcain Engineering
◆ Contract: FIDIC yellow book based
ITER – NUCLEAR
VIEW PROJECT
◆ International Thermonuclear Experimental Reactor
◆ Total Value : > 22 billion euros
◆ Start date: 2007, still ongoing.
◆ Nuclear fusion research Mega Project
◆ 500 MW of heat generated from fusion
for periods of 400 to 600 seconds
◆ Joint Undertaking: F4E
◆ Nuclear & Conventional Buildings: Consortium OMEGA
◆ Contract: FIDIC Yellow Book 99
EOLMED – OFFSHORE WINDFARM
Floating Platform – Port la Nouvelle
VIEW PROJECT
Construction Agreement provisions drafting or review, in accordance with the FIDIC Contract Yellow Book rev 2017
◆ 30MW
◆ Flotting offshore wind farm (3 wind turbines)
◆ Start date: 2020
◆ Contract value: 70 Million
◆ FIDIC yellow book based
CEA CADARACHE
Mazurka Nuclear Reactor Refurbishment
VIEW PROJECT
CONTRACT MANAGEMENT & TECHNICAL COORDINATION
◆ Contract value: 46 Million euros
◆ Disciplines: HVAC, Mechanical, Safety, Electrical , Utilities , Schedule and Commercial department
50 HERTZ – OFFSHORE WINDFARM
Survey & Electrical Cable Installation – Baltic Sea
VIEW PROJECT
CLAIM AGAINST THE UXO SERVEY COMPANY
BACKGROUND:
◆ Power: 2GW – Berlin, Germany
◆ Project start date: 2018
◆ Global project value: 1,5 billion euros
◆ Claim value: 2 figure million euros (confidential information)
◆ Bespoke contract & German civil law
FAYAT – NUCLEAR
Electrical / Control & Instrumention – ITER CADARACHE
VIEW PROJECT
CLAIM DRAFTING FOR ADDITIONAL PAYMENT & EoT
BACKGROUND:
◆ Nuclear plant
◆ Contract Start date: 2019
◆ Type of Contract: Design and installation
of Electrical and Control & Instrumentation systems.
◆ Project value: > 22 billion euros
◆ Contract Value: 6 million euros
◆ FIDIC Yellow book based.
INTERSERVE – WASTE TO ENERGY
Cogeneration Plant – Glasgow
VIEW PROJECT
CLAIM MANAGEMENT & DRAFTING
Background:
INTERSERVE Construction (ICL) Glasgow
◆ Project value: circa £150 millions
◆ Project start date: 2012
◆ Claim for Additional costs due to technical defects: > £30 millions
◆ Part of claim for delays: £20 millions
◆ FIDIC Contract EPC Yellow book based
YARA Gmbh – DeNOx
Biomass Plant – Le Moule Guadeloupe
VIEW PROJECT
SITE MANAGEMENT
◆ Type of project: DeNox (refurbishment)
◆ Contract value: 16 Million Euros
◆ Contract Start date: 2019
◆ Bespoke contract & French civil law
CUMMINS POWER GENERATION
EPC Projects UK
VIEW PROJECT
SITE DIRECTOR & DESIGN MANAGEMENT
Background:
◆ Gensets fabrication and Installation
◆ Client: UKPR
◆ Total value: £170 millions
◆ 18 Power plants of 2MW each
◆ 5 to 10 Gas Generators per Power Plant
SIEMENS VAI
EPC Processing lines CHINA
VIEW PROJECT
SITE MANAGEMENT
Project value : €100 Million
Construction of a processing steel line (continuous annealing lines, and galvanizing)
SIEMENS: Design, Manufacture, Transportation & logistic, and Installation.
Jurisidtion and law of China
ABB
Electrical and Control & Instrumentation Switchgear
VIEW PROJECT
PROJECT SCHEDULE IMPLEMENTATION FOR PLANNING AND RESOURCES ALLOCATION
Background:
◆ 50 projects requiring schedule,
◆ Average projects budget = 10kEuros up to 1MEuros
◆ Programmes independently managed for 3 sites,
◆ Resource managers dedicated to the allocation of resources on projects
◆ Project Start date: 2014
AREVA TV
Nuclear Submariners
VIEW PROJECT
QUALITY MANAGEMENT
Industrial supplies and services through planned interventions or specific upgrading for nuclear reactors for submariners.
Specific project Tools:
– Management document system : CHORUS
– MAIDOC – EVA (management of the equipment data, management of the Documentation and Management of Events)
PHOTOVOLTAIC
EPC Projects
VIEW PROJECT
PHOTOVOLTAIC PROJECT DEVELOPMENT
Background:
Project value : up to € 3 million
From 36kW to 1MW
Date: 2009 – 2011
Tools:
– Planning : MS Project 2007, – CAO : Autocad
– Calcul : Lise 2007, PVSyst, XLPro CalcuL
Outils :
Autocad
Lise 2007 – XLPRO CACUL – CANECO – METEONORM – PVSYST
CNIM
WASTE TO ENERGY EPC Projects – France & UK
VIEW PROJECT
DESIGN COORDINATION & SCHEDULING
◆ Project value : €150 Million
◆ Interfaces: Piping, HVAC, Mechanical, Safety, Electrical , Utilities , Schedule and Commercial department.